Pile Driving & Pull out tests
In an environment where every millimeter counts, designing structures on the ground requires more than just good calculations.
What We Do
1- Pull-Out Test for Photovoltaic Plants (PV Plants)
2- Validation of Driving Feasibility Based on Our Own Geotechnical Campaign.
3- Ground Zoning to Optimize Structural Layout.
4- Full-scale Vertical and Lateral Pile Tests.
5- Comprehensive Reports with Technical Interpretation and Design Recommendations.
6- Structural Optimization Using Specialized Software.
International Campaigns
We operate with our own resources in Europe, Africa, Asia, and the Americas, coordinating every stage: